Task List

Pre-Demo

Demo

not started

Pre-Install

not started

Drain Test

not started

Install

not started

Clean Up

not started

Job Type

Status

Pre-Demolition Preparation

The pre-demolition phase ensures that the site is ready for safe and efficient demolition. The installer or demo person will update their status throughout the process, triggering specific tasks and upload requirements to confirm readiness.

To begin Updated Your Status Below to "Start Now"

Task 1

Review the demolition plans, identifying areas for removal and areas to remain untouched.​ Mark off the areas on the job site.

Upload Photo

Task 1 Upload Picture

Your content has been submitted

An error occurred. Try again later

Task 2: Safety Inspection

Check for hazardous materials (e.g., asbestos, mold) or potential safety risks (e.g., loose wiring, unstable structures). Take a photo of any identified hazards or a note confirming the area is clear.

Upload Photo

Task 2 Upload Picture

Your content has been submitted

An error occurred. Try again later

Task 3: Utilities Shut-Off

Confirm that water, gas, and electricity have been shut off in the areas being demolished.

Take a photo of the shut-off valves or breaker box with a note confirming they’re off with date.

Upload Photo

Task 3 Upload Picture

Your content has been submitted

An error occurred. Try again later

Lay protective coverings on floors, walls, or other areas that need to remain intact.

Take a photo of the protective coverings in place.

Task 4: Site Preperation

Task 4: Site Preperation

Upload
Max: 2 MB

An error occurred. Try again later

Your content has been submitted

Set up tools and equipment for demolition. Ensure they are in working order and placed safely. Take a photo of the equipment set up and ready for use.

Task 5: Site Equipment Setup

Task 5: Site Equipment Setup

Upload
Max: 2 MB

An error occurred. Try again later

Your content has been submitted

Use tape or markers to clearly designate areas that should not be touched during demolition. Take a photo of the marked sensitive areas.

Task 6: Mark Sensitive Areas

Task 6: Mark Sensitive Areas

Upload
Max: 2 MB

An error occurred. Try again later

Your content has been submitted

Task 7: Final Check Before Demolition

Perform a walkthrough to ensure all tasks are completed and the site is ready for demo. Take a video walkthrough of the site, highlighting the prep work completed.

Task 7: Upload Video

Upload
Max: 2 MB

Demolition Process

The demolition phase focuses on safely and efficiently removing designated areas while protecting elements that must remain intact. Installers or demo personnel will update their status during the process, with tasks and upload requirements dynamically displayed based on their progress Update your status below to "Start Now"

Task 1: Safety Check

Reinspect the area for potential hazards and ensure utilities are still off. Take a photo of the inspected area and a note confirming safety compliance.

Task 1: Upload Safety Check Photo

Upload
Upload a Video or Photo

Your content has been submitted

An error occurred. Try again later

Task 2: Verify Protective Coverings

Ensure that protective coverings on floors, walls, or fixtures are secure and undamaged. Take a photo of all protective coverings in place.

Task 2: Photo of Protective Coverings

Upload
Upload a Video or Photo

Your content has been submitted

An error occurred. Try again later

Task 3: Begin Controlled Demolition

Start removing designated materials or structures carefully to avoid damaging areas that should remain intact. Take a photo showing the results of demolition.

Task 3:Controlled Demolition Upload Photo

Your content has been submitted

An error occurred. Try again later

Upload

Task 4: Separate Recyclable Materials

Sort debris into recyclable and non-recyclable materials for proper disposal.Take a photo of separated materials in their respective piles or containers.

Task 4: Photo of Separated Recyclable Materials

Your content has been submitted

An error occurred. Try again later

Upload

Task 5: Inspect After Demo

Inspect for hidden issues (e.g., structural damage, mold, pests) uncovered during demolition. Upload a photo results, if there are problems write a note and label the issue on the photo

Task 5: Photo Upload Photo of inspection. If there are issues add a note in the image.

Your content has been submitted

An error occurred. Try again later

Upload

Task 6: Clear Debris

Remove all demolition debris from the worksite and sort for disposal. Take a photo of the cleared area showing all debris removed.

Task 7: Upload Photo of Cleared Area

Your content has been submitted

An error occurred. Try again later

Upload

Task 7: Inspect Exposed Areas

Check exposed plumbing, electrical wiring, framing, and subfloors for damage or readiness for next phase. Take a photo of the exposed areas with notes documenting their condition.

Task 7: Upload photo of the exposed areas. (if there is an issue add a note in the picture)

Your content has been submitted

An error occurred. Try again later

Upload

Task 8: Final Walkthrough

Conduct a walkthrough to ensure all demolition is complete and the site is ready for post-demo inspection. Take a video walkthrough showing the completed demolition and cleared site.

Task 8: Upload a video walkthrough showing the completed demolition and cleared site.

Your content has been submitted

An error occurred. Try again later

Upload

Pre-Installation Preparation

Pre-installation preparation ensures the site is fully ready for a smooth and efficient installation. This step involves finalizing measurements, verifying material readiness, and organizing tools and materials. Installers will update their status during the process, dynamically triggering tasks and upload requirements. Update Status To "Start Now"

Verify Site Readiness:

  • Task: Inspect the site to ensure it is clean, debris-free, and organized for installation.

  • Upload: Upload photos of the cleared and prepped site.

Upload
Upload a Video or Photo
Next

Review Design Plans:

  • Task: Confirm that design plans, blueprints, and layouts match the site’s current condition.

  • Upload: Take a photo of the design plans laid out with notes or annotations as needed.

Upload
Upload Photo or Video
Next

Check Utilities:

  • Task: Verify that all utilities (water, gas, electricity) are functional and ready for installation.

  • Upload: Upload a photo of utility access points or a note confirming readiness.

Upload
Upload Photo or Video
Next

Inspect and Organize Materials:

  • Task: Check materials for defects, damage, or inconsistencies with the design specifications.

  • Upload: Take photos of inspected materials, especially any damaged items that need replacement.

Upload
Upload Video or Photo
Next

Mark Placement Areas:

  • Task: Use marking tools to outline the placement of components such as cabinets, fixtures, or appliances.

  • Upload: Take a photo of the marked placement areas.

Upload
Upload a Video or Photo
Next
  1. Prepare Tools and Equipment:

    • Task: Set up tools and equipment, ensuring they are functional and ready for use.

    • Upload: Take a photo of the organized tool setup.

Upload
Upload a Video or Photo
Next

Final Pre-Install Check:

  • Task: Perform a walkthrough to confirm that all pre-installation tasks are completed.

  • Upload: Upload a video walkthrough showing the fully prepared site and materials.

Upload
Upload a Video or Photo
Next

Report Any Issues:

  • Task: Document and report any unresolved issues, such as missing materials or site readiness concerns.

  • Upload: Take photos of the issues with notes explaining the problem.

Upload
Upload a Video or Photo
Submit for Approval

Drain Test

The Drain Test is a straightforward procedure used to check for proper drainage, identify potential clogs, and ensure there are no leaks in the plumbing system. It typically involves filling specific sections with water or running water through them, observing flow rates, and detecting any leakage points or blockages. By conducting this test, you can pinpoint issues early and maintain efficient plumbing operation. Click "Get Started" To Begin

Drain Test

  • Do a drain test and upload a video at least 2 minutes confirming everything is working.

Upload
Upload a Video or Photo
Submit for Approval

Installation Phase

The installation phase focuses on precision, craftsmanship, and functionality. Installers are responsible for properly placing, securing, and testing all components. Progress is tracked through status updates, with tasks and uploads dynamically displayed to ensure quality and accountability. Update Your Status Below to "Start Now" To get started.

Verify Site Readiness:

  • Task: Inspect the site to ensure it is clean, debris-free, and organized for installation.

  • Upload: Upload photos of the cleared and prepped site.

Upload
Upload a Video or Photo
Next

Review Design Plans:

  • Task: Confirm that design plans, blueprints, and layouts match the site’s current condition.

  • Upload: Take a photo of the design plans laid out with notes or annotations as needed.

Upload
Upload Photo or Video
Next

Secure Components:

  • Task: Fasten materials using appropriate hardware (e.g., screws, bolts, adhesives).

  • Upload: Take photos of fasteners and the secured components.

Upload
Upload Video or Photo
Next

Check Alignment and Leveling:

  • Task: Use leveling tools to ensure all components are properly aligned and balanced.

  • Upload: Take a photo or video showing alignment checks.

Upload
Upload a Video or Photo
Next

Connect Utilities:

  • Task: Connect plumbing, electrical, or gas lines for fixtures and appliances.

  • Upload: Take photos of connected utilities (e.g., water lines, electrical wiring).

Upload
Upload a Video or Photo
Next

Seal Joints and Gaps:

  • Task: Apply caulk, grout, or other sealing materials to seams and gaps.

  • Upload: Upload photos of the sealed areas, focusing on quality and uniformity.

Upload
Upload a Video or Photo
Next

Test Functionality:

  • Task: Test installed fixtures and appliances (e.g., water flow, electrical outlets, gas lines).

  • Upload: Take a video demonstrating the functionality of tested items.

Upload
Upload a Video or Photo
Next

Perform Quality Check:

  • Task: Inspect all installed components to ensure stability, alignment, and quality craftsmanship.

  • Upload: Upload a video walkthrough highlighting the completed installation.

Upload
Upload a Video or Photo
Next

Report Any Adjustments:

  • Task: Document any fixes or adjustments made during installation (e.g., leveling corrections, part replacements).

  • Upload: Take photos or videos of adjustments with notes.

Upload
Upload a Video or Photo
Next

Prepare for Clean-Up:

  • Task: Remove protective coverings and clean installed surfaces to prepare for the next phase.

  • Upload: Upload photos of the cleaned and finalized installation.

Upload
Upload a Video or Photo
Submit for Approval

Clean-Up and Final Walk-Through

The clean-up and final walk-through phase ensures that the installation area is thoroughly cleaned and inspected to meet quality standards and client expectations. This includes detailed cleaning, final inspections, and documenting the site's condition post-installation. Update your status to "Start Now" to get started

Prepare for Final Walk-Through:

  • Task to Prepare for: Inspect all installed components to ensure stability, alignment, and compliance with project specifications.

  • Task to Do: Take photos of each installed area for documentation.

  • Completion of Task: Upload photos showing each installed area.

Upload
Upload a Video or Photo
Next

Test Functionality:

  • Task to Prepare for: Retest plumbing fixtures, electrical outlets, and appliances to verify proper functionality.

  • Task to Do: Upload a video demonstrating the successful testing of all fixtures and systems.

  • Completion of Task: Upload the testing video.

Upload
Upload Photo or Video
Next

Make Final Adjustments:

  • Task to Prepare for: Address any issues found during the final inspection, such as leveling, sealing, or alignment adjustments.

  • Task to Do: Take photos or videos of adjustments made, with notes on what was fixed.

  • Completion of Task: Upload photos or videos showing adjustments and notes.

Upload
Upload a Video or Photo
Next

Remove Protective Materials:

  • Task to Prepare for: Carefully remove all protective coverings (e.g., tape, plastic sheets) from installed components.

  • Task to Do: Upload photos of the site with protective materials fully removed.

  • Completion of Task: Upload photos showing the site without protective materials.

Upload
Upload a Video or Photo
Next

Perform Detailed Cleaning:

  • Task to Prepare for: Wipe down and polish all installed surfaces, clean up debris, and vacuum or sweep the entire area.

  • Task to Do: Take photos of the cleaned site, focusing on polished and finished surfaces.

  • Completion of Task: Upload photos of the thoroughly cleaned site.

Upload
Upload Video or Photo
Next

Prepare for Client or Supervisor Review:

  • Task to Prepare for: Ensure the site is clean, organized, and ready for client or supervisor review.

  • Task to Do: Upload a video walkthrough of the completed site, highlighting all finished installations.

  • Completion of Task: Upload the video walkthrough.

Upload
Upload a Video or Photo
Next

Document Remaining Issues (if any):

  • Task to Prepare for: Document and report any unresolved issues or pending tasks for follow-up.

  • Task to Do: Take photos or videos of areas needing attention, with detailed notes.

  • Completion of Task: Upload photos or videos of areas with notes.

Upload
Upload a Video or Photo
Next

Submit Final Documentation:

  • Task to Prepare for: Upload all photos, videos, and notes into the system for supervisor review and project sign-off.

  • Task to Do: Confirm that all documentation has been submitted accurately.

  • Completion of Task: Confirm submission of all required documentation.

Upload
Upload a Video or Photo
Submit for Approval